Structural Engineering - Projects


Bridges

Tangenziale Alessandria
ANAS VIABILITY DEPARTMENT FOR PIEDMONT - LOMBARDINI URGENT CONSTRUCTION WORKS ON THE ALESSANDRIA DEVIATION TO BLOCK FLOODING FROM THE BORMIDA AND TANARO RIVERS EXECUTIVE PROJECT – FEASIBLE 2002-2008
Ponte Orti
MUNICIPALITY OF ALESSANDRIA WORKS TO BUILD A NEW BRIDGE OVER THE TANARO RIVER IN ORTI AND COLLABORATION ON THE EXECUTIVE PROJECT, CALCULATION REPORT, ENVIRONMENTAL BLENDING REPORT, LANDSCAPE CONSOLIDATION 1996
Ponte Bormida
COOPSETTE S.C. ARL. CONSTRUCTIONS WORKS OF THE NEW BRIDGE OVER THE RIVER BORMIDA, WITH VIADUCT AND CONNECTING VIABILITY OF THE ROUNDABOUT IN VIA GENOVA, SPINETTA MARENGO WITH THE ALESSANDRIA BYPASS. PRELIMINARY, FINAL, EXECUTIVE PROJECT, ENVIRONMENTAL INTRODUCTION STUDY, WORKS MANAGEMENT AND SAFETY COORDINATION DURING DESIGN AND EXECUTION 2005

Buildings

Milano-Scienze Politiche
RESTORATION WORKS TO THE BUILDING COMPLEX OF THE POLITICAL SCIENCES FACULTY IN MILAN FEASIBLE WORKABLE DESIGN 2000 - 2004 LOCALITY: Milan, Via Conservatorio, 7 COMMISSIONED BY: GRASSETTO LAVORI S.p.A.
Passerella Pedonale San Donato Milanese
ANAS - MILANO THE AIM OF THE PROJECT IS THE CONSTRUCTION OF A PEDESTRIAN BRIDGE WITH STEEL TRUSS STRUCTURE, IN ORDER TO CROSS THE STATE HIGHWAY N. 415 “PAULLESE”, NEAR VIA ALDO MORO CROSSING, IN THE MUNICIPALITY FO SAN DONATO MILANESE (MI). 1998